Case 01Dairy, whey-fat concentrate · Eastern Europe · 2019–2020 · Installation and commissioning lead

The third plant in the country — and the first to pass state certification

Challenge

Install, tune and commission the entire plant: from intake of 600 tonnes of whey per day to packing of the finished product with 50–55% fat content.

Root cause

Two similar plants had been built in the country before. Neither passed state certification — on product quality, fat composition or design capacity.

What was done

Led installation, tuning and commissioning of all plant lines.

Result

The plant passed state certification — unlike the two before it.

Project manager · Supervisor2 years
Equipment delivery Chamber pre-assembly Foundation Drying chamber installation Equipment installation Building frame Cladding Finished production hall

Equipment delivery

Case 02Meat processing, animal protein powders · Eastern Europe · 2022 · General contractor

A 4,500 m³ plant delivered turnkey — on second-hand equipment and a quarter of the original budget

Challenge

Build and commission a complete drying plant: spray dryer, powder storage silo, CIP station and cleaning system, and filling and packaging machine.

Root cause

The company dropped its bank investment loan and financed construction from working capital. With the budget cut fourfold, all equipment was bought second-hand — condition unknown and without engineering documentation for the new site.

What was done

Ran the project from procurement to start-up: work planning, installation supervision and commissioning.

Result

The plant reached 100% of design capacity.

Project manager · Supervisor · Consultant18 months

Confirmed by a written reference from the plant owner

Plant construction site Process equipment installation Lifting a drying chamber section Drying towers and steel structure

Plant construction site

Case 03Oil refining, catalysts · CIS · 2020–2022 · Supplier’s representative

A €35m catalyst drying plant — from tender to completion

Challenge

Supply process equipment for a catalyst drying plant for the oil industry and take the project from tender to completion.

Root cause

Catalysts have strict physical and chemical requirements. Any mismatch between the client’s specification and the manufacturer’s technical specification means the equipment won’t deliver the required product.

What was done

Represented the equipment supplier and ran the project from tender to completion.

Result

A €35m project delivered.

Project manager3 years
Case 04Food additives, silicon dioxide · Eastern Europe · 2018 · Modernisation lead

From 30–40% waste to zero. Without stopping production

Challenge

The customer needed a granulated product with a guaranteed granule size of at least 0.8–1 mm. The dryer produced a mix of sizes: 30 to 40% of finished product went to waste.

What was done

Developed and implemented a modification of the nozzle spray dryer.

Result

Waste down from 30–40% to zero. Only granules of the right size.

Project manager7 months — from ordering equipment to commissioning
Case 05Food industry, dietary fibre · Eastern Europe · 2025 · Consultant

Yellow colour and burnt particles in the product — the cause wasn’t in the dryer

Challenge

Dietary fibre was dried in a fluid bed and finished in a drum dryer. The product came out yellowish with burnt particles — and burnt particles are unacceptable in the finished product. The line kept stopping for cleaning.

Root cause

Unacceptable substances in the raw material affecting colour and burning.

What was done

Organised raw material analysis in several independent laboratories and found the cause.

Result

6 times fewer stops for cleaning. Production running at full load.

Consultant
Case 06Building materials, ceramic tiles · Eastern Europe · 2004–2005 · Installation and commissioning lead

A turnkey ceramic tile plant — with output exported to the EU

Challenge

Install, tune and commission the entire plant: from mineral raw material silos to packed tiles in the warehouse.

What was done

Led installation, tuning and commissioning of all plant lines.

Result

The plant became one of the leading producers of quality tiles.

Project manager · Supervisor2 years
Line before dismantling Dismantling Component preservation Ready for shipment

Line before dismantling

Case 07Dairy industry, milk powder · Eastern Europe · 2021

Dismantling a process line for export — and a successful restart at its new site

Challenge

Dismantle the line — spray dryer, vacuum evaporator and powder storage silo — without damage, then pack and prepare it for export shipment.

Root cause

The company was selling the production line. The new owner had to reassemble and restart it at a different site, so any damage to components or loss of documentation would have made reassembly impossible.

What was done

As supervisor, organised and carried out all dismantling work.

Result

The line was reinstalled and successfully commissioned at its new owner’s site.

Supervisor5 weeks
01

Project scale

  • A completed €35m project — a catalyst drying plant for oil refining
  • A €250m protein plant project in the EU, prepared with consulting support from KPMG
  • Participation in developing a patent for deep soy processing
02

References

KPMG · EU project · 2022

KPMG — one of the Big Four advisory firms — confirmed in writing the professionalism and strong business acumen shown on the development of a food processing plant in the European Union.
Reference from a KPMG Partner, Head of Advisory

Plant owner · 4,500 m³ facility

The owner of a protein powder plant confirmed the full scope of work — from building construction to line commissioning — and highlighted an inventive approach to complex technical challenges.
Reference letter from a board member of the client company
Free express analysis

A free express analysis of your dryer

  • The likely cause of the problem
  • What to check first
  • Whether a site visit is needed — or remote recommendations are enough

Send photos and video — I’ll reply in writing within 3 working days.